Pricing:
Introduction: Pricing is to put price on a product which determines whether we will be able to sell a product or sustain manufacturing in long term (if price is below legitimate profit then one may not be able to survive). Pricing proposal should be derived from the goal of the company, which as stated in book “The Goal” is:
“To make money by increasing net profit, while simultaneously increasing return on investment and simultaneously increasing cash flow.”
Potential constraints of the system are:
1) Market: Eg. Because of high competition, low cost (Chinese) competitors and other reasons market is not allowing to put higher margin that we may want.
2) Factors of production: There are 2 fundamental factors of production: Capital and Labor. Pricing should take into account both these factors.
Manner in which these variables are related it as follows: As we can see in the pricing structure below, there is floor price (we cannot go below that) and ceiling price (market will not allow us to go up this). Factors of production define floor price and market determines ceiling price.

A) If ceiling price (CP) > floor price (FP), then we may modify our offer to achieve company objective.
B) If ceiling price (CP) < (FP) then no bid or strategic offer
But it is not always possible to know what is CP (lack of information). And in these products, if we don’t have target price from customer, comparison from competition or previous experience, then we may not be able to decide what market expectations are. In those cases, we need to determine overall margin for that proposal and check if it agrees with price from production factors or not.
1) Deciding CP: Straight forward method will be to get target price form customer or getting competition price for same product or decide it on basis of past experience. But as we said before, it is not always possible to get it. In its absence, next logical step is to find out overall margin (OM) on the product. Overall Margin (OM) is the margin which indicates how much premium we are putting on our services for a particular customer order. Attempt is to list down exhaustive and mutually non-exclusive criteria so that we can come-up with some formula to decide overall margin:
i) competition present for that particular RFQ (say a)
ii) strategic importance of customer/ RFQ (say b)
iii) industry norm for that product line (industry in which customer operates) (say c)
iv) previous history with that customer (say d)
Now if we have properly analyzed all the above parameters, we can define OM for an RFQ. We need to assign weightage to each parameter to calculate the overall margin. Also we may give scales on which these parameters have to be rated.
i) Competition: Let’s rate competition for an RFQ on scale of 1 to 10. Since increase in competition means lesser margin, we will give lower marks for higher competition and vice-versa. Weightage = 40%
CHECK LIST (TO BE ANSWERED) BEFORE DECIDING THE MARKS
| How fierce is competition for this order? | |
| What are standard rates for similar products (if available in market)? | |
| What is the size of nearest competitor? (if known) | |
| Is it single tender basis or only by invitation or open tender? | |
| Is there any target price set for the order? | |
ii) Strategy: Does customer fit in GOAL’s overall strategy? How important it is to get that order? We will rate this parameter again on 1-10 scale. If customer / Order is more important than we will give lower Mark and consequently lesser margins). Weight = 30%
CHECK LIST (TO BE ANSWERED) BEFORE DECIDING THE MARK
| Do we have enough capacity to carry out this order? | |
| Do we have enough technical know-how for this order? | |
| How important this customer is in my long term growth strategy? | |
| Will this customer give us entry into totally new market? | |
| Will this order give us entry into totally new product line? | |
| Is this long term customer or new customer? | |
| Is it budgetary offer or RFQ? | |
iii) Industry: Industry in which customer is operating will impact our margins. For example if it is semi-conductor industry, where margins are very low, then we may not able to quote higher margin. We will rate this factor on the basis of favorability (unfavorable). If it favorable to us we will we will give more mark otherwise fewer. Scale will be defined 1 to 10. For neutral (or no information) we will give 5 marks. Weight = 10%
CHECK LIST (TO BE ANSWERED) BEFORE DECING THE MARK
| Is this industry, price sensitive? | |
| What are average margins for enquired product in customer’s industry? | |
| Is value of our supply big part of customer’s end product cost? | |
| Is quality of our supply very important for customer’s end product? | |
iv) History: Previous history with customer (or customer’s Sourcing practice) can be a big help in deciding margins. Has customer always insisted on lower price? Or if his main concern is quality then we can charge more? Rating scale is based on customer favorability, from 1 to 10. If favorable then higher Marks (for no information we can give 5 marks). Weight = 20%
CHECK LIST (TO BE ANSWERED) BEFORE DECING THE MARK
| Is customer price sensitive? | |
| Is it on tender basis / negotiations possible after giving first quote? | |
| Have we given discounts to the customer in the past? | |
So formula for calculating OM
= a/10 * 35% + b/10 * 35% + c/10 * 15% + d/10 * 15%
= (a * 0.35) + (b*0.35) + (c*0.15) + (d*0.15)
---------------------------------------------------
10
This method is to decide our target margin for an RFQ (not individual parts). And then individual margins have to be decided on Value Addition basis.
2) Deciding FP: Deciding FP means putting premium on factors of production. Firm needs to know what its costs are and accordingly should put margin on different factors. By theory, we have 4 factors of production: Land, Labor, Entrepreneurship and Capital. But as land and entrepreneurship are common across all proposals, hence we need not worry about them while pricing. So we will concentrate on labor and capital only. A product cost can be broadly divided into 2 parts:
i) Raw material (RM) (includes related overheads)
ii) Value addition (VA) (includes related overheads)
so, Total cost (TC) = RM + VA
RM is directly related to Capital or investment made. VA is directly related to labor. So when we put margin on total cost we are in effect putting margin on our capital and labor resources. Let’s see what happens when we put flat margin (present pricing method) on TC,
FLAT Margin = 50%

Observations from above table:
I. For Part no. A, both labor and capital have been equally compensated (Mar/VA = ROI)
II. For Part no. B, job consumes more labor and less capital, hence ROI is better than Mar/VA
III. For Part no. C, job consumes more of capital as compared to labor and hence Mar/VA is better than ROI.
Now let’s add real constraints to this system, assuming
Capital available = 500
Labor available = 500
No. of Jobs possible Net profit
Job A 500 / 75 = 6.67 1000
Job B 500 / 100 = 5 750
Job C 500 / 100 = 5 750
In this situation, one can take up 6.67 A type jobs or 5 B type jobs or 5 C type jobs. Naturally since absolute margin is same, doing more no. of jobs will result in more profit. Hence job- A optimizes the use of given resources. (all the rest combinations result in less than optimum use of resources) Now we can say that successful implementation of flat margin system is based on following assumptions:
a) Equal capital and labor resources availability
b) Job will consume equal or almost equal quantities of both resources.
And in all other cases wherever job consumption is different for capital and labor, system will have less than 100% utilization. Now let us see what happens if we have input resources in some other ratio. (other than 1:1).

As we can see from above cases, in case of one resource being less than other, doing jobs which use constrained resource more efficiently give more utilization and profit. In other words we would like to execute orders which require less of constraint resource. Hence pricing should encourage customers to give orders which are high on non-constrained resource (Job A in CASE:2 and Job C in CASE: 3). This is possible when we have different margins for different factors of production.


No comments: